This has reference to the RfS issued by SECI for 160 MW in Uttar Pradesh (Non-Solar park) under JNNSM Ph-II, Batch-III.
The Pre-bid Meeting for the same scheduled on 24.05.2016 is postponed till further notice. The details of the venue shall be notified shortly.