Pre-bid meeting link: Setting up of Grid-Connected Solar PV Projects with Battery Energy Storage System (BESS) in Lakshadweep under RESCO Mode

With reference to the RfS issued for Selection of Solar Power Developers for Setting up Grid-Connected Solar PV Projects with Battery Energy Storage Systems (BESS) in Lakshadweep under RESCO Mode Through Tariff Based Competitive Bidding, the pre-bid meeting has been scheduled as per the following schedule.

Date and time of Pre-bid meeting: 26.06.2024, at 02:30 PM (IST)

The meeting will be conducted through video-conferencing on the Microsoft Teams Platform. The meeting link for the same is as follows. 

Pre-bid meeting link: https://teams.microsoft.com/l/meetup-join/19%3aXTet8N6xkE_6eHvy05IhHjREk102bgbYd2exX2o-3pU1%40thread.tacv2/1719305251954?context=%7b%22Tid%22%3a%22a24b3e19-3a1f-4c61-9f1e-cace38462ab7%22%2c%22Oid%22%3a%225164b124-35cd-46f3-97d9-6f9cc331e98c%22%7d